Stand in the middle of a single storey extension and look up at a plain plastered ceiling. Somewhere above that plaster is a row of timber joists, all running the same way, and the direction they run decides more about a roof lantern than the glass, the frame colour or the shape. It decides how many joists the opening crosses, how the cut timbers are carried, where the lantern can sit comfortably and whether the carpentry is a short job or a designed one. This guide is about that hidden layer: the joists, the trimming that replaces what the opening removes, and the size of hole a lantern actually needs.
It is written for owners around Basingstoke with a flat roofed kitchen, family room or converted garage who want a raised glass roof and would like to understand the structure before anyone lifts a saw. The wider job, from choosing the frame to the finished ceiling, is on the roof lantern installation page. The survey confirms every detail on the real roof; the aim here is that nothing it finds comes as a surprise.
Which way the joists run, and how to find out
Flat roof joists span the shortest practical distance between two supports. On a rear extension that usually means they run from the back wall of the house out to the far wall of the extension, front to back, resting on a timber wall plate or in hangers at one end and on the outer wall at the other. On a wide, shallow extension, or a side extension along the flank of the house, the shorter span may be the other way, so the joists run across the room instead. A converted garage often keeps the original garage roof, which was built to its own pattern and may run either way.
You can often work out the direction without opening anything. Ceiling cracks and board joints tend to follow or cross the joists in a regular rhythm. A stud finder run across the ceiling picks up the fixings at each joist. Downlights, if there are any, were usually set between joists, so a neat line of them hints at the gaps. Outside, the edge of the roof can give a clue too: where the joists end at a fascia, their ends sit behind it; where they run parallel to an edge, that edge is carried by a single outer joist.
None of this replaces the survey, which checks the direction, the depth of the joists and their centres from above and below. It simply means you can picture the job when the conversation starts.
How a roof lantern sits on a flat roof
- Ridge, where the glazing bars meet at the top
- Hip bar, closing each sloped end of the lantern
- Glazing bar, holding the edges of the glass
- Glass panel, sealed double or triple glazed units
- Eaves or perimeter frame, which the whole lantern stands on
- Insulated kerb (upstand), raising the lantern clear of the roof
- Flat roof covering, dressed up the kerb and under the frame
- Plastered reveal, lining the lantern well into the room below
Why the opening crosses joists at all
Flat roof joists on a domestic extension are typically set at 400mm or 600mm centres. A lantern base is wider than either gap, so unlike a small flat rooflight that can sometimes drop between two joists, a lantern opening almost always takes one or more joists out of the middle of the roof. Each of those joists was carrying its strip of roof, the insulation, the covering, the ceiling and whatever snow or foot traffic the roof sees. When a length of it is cut away, that load does not vanish. It has to travel sideways into timbers that are still whole and then down into the walls.
That sideways journey is what trimming means. It is ordinary carpentry, set out in every framing textbook, and a well trimmed opening is as sound as the roof around it. What makes it matter is that the load has to arrive somewhere able to take it, and the timbers doing the carrying have to be sized for their new job rather than their old one.

The parts of a trimmed opening
A trimmed opening has its own small vocabulary, and knowing it makes a quotation or a Building Control conversation much easier to follow. The table sets out each part and what it does in a lantern opening.
| Part | Where it sits | What it does for the lantern |
|---|---|---|
| Trimmed joists | The joists cut short by the opening | Now stop at the opening and hang off the trimming joist instead of reaching a wall |
| Trimming joist | Across each end of the opening, at right angles to the joists | Collects the load from the cut joists and passes it sideways to the trimmers |
| Trimmers | Along each long side of the opening, parallel to the joists | Carry the extra load from the trimming joists down to the walls, often doubled or deepened to do so |
| Joist hangers and bolts | At every junction between the timbers above | Make the connections carry load rather than rely on nails in the end grain |
| Kerb or upstand | On top of the framed opening, around its edge | Lifts the lantern above the covering; it sits on the trimmed frame, so the frame sets its size |
The kerb itself, and how high it should stand above the roof, belongs to the guide on kerb height and falls. What matters here is that the kerb bears on the trimmed frame, so the frame has to be right before anything else is built on it.
Joists running along the lantern or across it
Most lanterns are rectangles, and a rectangle can sit with its long side parallel to the joists or across them. That orientation changes the carpentry more than almost anything else.
Long side running with the joists
When the lantern's length follows the joists, the opening cuts through fewer of them, because only the short side crosses the joist run. The trimming joists at each end are short, the loads they pass to the trimmers are modest, and the trimmers run the full length of the roof alongside the opening. On a front to back kitchen extension, a lantern laid lengthways down the room usually works out this way, and it is often the simpler frame to build.
Long side running across the joists
Turn the same lantern through ninety degrees and the long side now crosses the joist run. More joists are cut, the trimming joists become long beams in their own right, and the load gathered onto each trimmer is greater. It is entirely buildable, but it is more likely to call for deeper or engineered trimmers and a calculation. A lantern laid across a narrow rear extension, parallel to the back wall of the house, can fall into this pattern.
Turn a lantern through ninety degrees and the glass looks the same from the kitchen, but the timber above the ceiling does very different work.
The shape of the room below still has the first say. Sizing a roof lantern to the room below explains how the lantern is matched to the table, the island or the length of the space; the joist direction then shows which way round that size is easiest to frame, and sometimes a small change in proportion saves a great deal of structural work.
The opening size is not the lantern size
Lantern makers quote sizes in different ways, and the difference between them causes more confusion than any other part of the job. There are three measurements to keep apart.
- The internal opening. The clear hole in the ceiling, finished with plastered reveals. This is what you see from the room and what the daylight passes through.
- The kerb or upstand size. The outside dimension of the kerb the lantern sits on. Most manufacturers size their lanterns to this, and it is larger than the internal opening by the thickness of the kerb and its insulation on every side.
- The overall lantern size. The frame and its drip edge, which oversail the kerb so water runs off onto the roof covering. This is the footprint you see from an upstairs window.
The trimmed structural opening sits between the first two: framed to suit the kerb, with the reveals finished inside it. When a brochure says a lantern is a certain size, it is worth asking which of these three it means before comparing it with the ceiling you have in mind. The survey measures all three against your roof, so the quoted lantern, the kerb and the frame all agree.
Position: walls, edges and what is already up there
Where the opening goes is shaped by what surrounds it. Keeping the lantern clear of the house wall leaves room for the covering to be dressed properly at the abutment and for the trimmer on that side to find a good bearing. Staying clear of the outer edge keeps the gutter detail and the fascia intact. How far a roof lantern should sit from the wall gives the direct answer on spacing.
Above the ceiling there are other things to find first. Extractor ducting from a cooker hood often runs between joists to an outlet in the fascia. Cables for downlights and sockets run through or across the joists. Some extensions have a steel beam where the old back wall of the house was opened up, and the joists may land on it rather than on the wall. A beam like that changes where the load goes and is always picked up on the survey. On a converted garage, the old garage roof may have been reused, strengthened or replaced when the room was made habitable, and the guide on lanterns over a converted garage covers what that means.
The rule: the opening goes where the room wants the light, as long as the trimmers can reach a sound bearing. The exception: where a steel, a flue or a run of services sits exactly where the light is wanted, the lantern moves a little or changes proportion rather than the structure being forced around it.
When a calculation comes into it
Trimming a single joist for a small lantern on a short span is routine carpentry that follows standard practice. As the opening grows, as more joists are cut, as the span lengthens, or as the trimmers start carrying a lantern of real weight, the sizes of the new timbers stop being a matter of rule of thumb and become a matter of calculation. Glass lanterns are heavier than the polycarbonate roofs some extensions were built with, and how heavy a roof lantern is sets out what drives that weight.
Whether a structural engineer is needed depends on the roof, not on the lantern catalogue. Does a roof lantern need a structural engineer? answers that directly. In practice, if the survey shows the opening is anything beyond straightforward trimming, the design for the new timbers is settled before a date is booked, so nothing on the day is decided by eye.
Larger openings also run into the limits of the roof itself. There is a point where a single lantern would ask too much of the joists, and two smaller lanterns, or a lantern with a supporting beam set into the ceiling, become the better answer. How big a roof lantern can be looks at where those limits come from.
Building Control and the new structure
Cutting and trimming roof joists is structural work, and fitting a new glazed roof element brings in thermal performance too, so a lantern installation is normally a matter for Building Control. The questions an inspector is interested in line up with the ones in this guide: what was cut, what carries the load now, how the connections are made and how the opening is insulated. Do roof lanterns need Building Regulations approval? covers the approval route in a few paragraphs.
From your side, the paperwork is taken off your hands. Everlight notifies Building Control for the work and keeps the trimming details and any calculation together, so the inspector sees the frame as it was built and the file is in order when you come to sell. Planning is a separate question, usually about how high the lantern stands and where the extension is, and it has nothing to do with the joists.
How the opening is formed on the day
With the design settled, the structural part of the job follows a fixed order. The detail varies with the covering and the room, but the sequence does not.
- Protect the room. Floors and worktops are sheeted, and a dust screen goes up if the extension opens onto the rest of the house.
- Prop before cutting. The joists to be cut are supported from below with temporary props, so no timber is ever left carrying nothing.
- Open the covering and deck. The roof covering and boards are cut back over the opening only, keeping the rest of the roof weathertight.
- Fit the trimmers first. New or doubled trimmers go in alongside the opening and are fixed to bearings at each end.
- Cut and hang. Only then are the joists cut, and the trimming joists fitted across each end on hangers or bolts to the design.
- Build the kerb. The kerb is fixed to the framed opening, insulated and squared, ready for the covering to be dressed up it and the lantern to be set.
- Close in the ceiling. Reveals are boarded and insulated inside, then plastered, so the finished opening meets the ceiling cleanly.
The glazing, weathering and finishing that follow are part of how a roof lantern is installed from start to finish.
What to have in mind before the survey
A little preparation helps the survey get to the useful part quickly. It is worth knowing roughly where in the room you would like the light, and whether you picture the lantern running down the length of the room or across it. If you have the drawings from when the extension was built, or the completion certificate, they often show the joist size, direction and centres, which saves guesswork. If there is loft or void access at the edge of the roof, clear a path to it. And if the kitchen is due to be refitted, mention where the hood and lighting will go, because those services and the trimmers need to agree.
From there the surveyor checks the joists, the bearings and the covering, measures the opening against the kerb and lantern sizes, and tells you plainly whether it is a straightforward trim or a designed one, before any figure is written down. The work carries a 10-year workmanship guarantee, which is not insurance backed. For pitched roof windows and flat rooflights as well as lanterns, the skylight and rooflight installers around Basingstoke page shows the full range.
If you would like the joists above your own ceiling looked at properly, ask for a roof survey and the opening will be worked out from the roof you have.