That is the short answer for a new extension and for an existing fibreglass roof alike. What changes between the two is the order of work and how the fresh resin meets the old. Our roof lantern installation service plans the kerb and the covering together from the survey onward, because on a GRP deck they are one job rather than two trades working around each other.
Below is why the material suits a lantern, how the kerb is formed on a new roof and cut into an older one, and the points that decide whether a particular deck is ready for the glazing.
Why a fibreglass deck suits a lantern
A GRP covering is built on site: a reinforcing mat is wetted out with resin over a timber deck, usually OSB3 or tongue and groove boards, and finished with a pigmented topcoat. Because it is laid wet and cures into one sheet, it follows shapes that a roll or membrane has to be cut and folded around. The angle where the flat deck turns up into a kerb is handled with a preformed angle trim and extra mat, then the laminate simply continues upwards.
For a roof lantern that matters. The weak point on any flat roof opening is the joint between the horizontal covering and the vertical upstand. On a GRP roof there is no joint there in the ordinary sense, just a bonded laminate running unbroken from the deck to the top of the kerb, where the lantern frame then seats on its own gasket or bedding.

How a roof lantern sits on a flat roof
- Ridge, where the glazing bars meet at the top
- Hip bar, closing each sloped end of the lantern
- Glazing bar, holding the edges of the glass
- Glass panel, sealed double or triple glazed units
- Eaves or perimeter frame, which the whole lantern stands on
- Insulated kerb (upstand), raising the lantern clear of the roof
- Flat roof covering, dressed up the kerb and under the frame
- Plastered reveal, lining the lantern well into the room below
New roof or existing roof: the two routes
How the work runs depends on whether the fibreglass is going down fresh or has been on the extension for a while. Both are sound; they simply start from different places.
| Stage | New GRP roof | Existing GRP roof |
|---|---|---|
| Opening | Framed in the joists before the deck boards go down | Cut through the laminate and deck, with the joists trimmed to suit |
| Kerb | Built on the deck and laminated in with the rest of the roof | Built into the new opening, then bonded to the surrounding laminate |
| Laminate join | None: one lay-up covers deck and kerb together | The old surface is abraded and cleaned so the new mat and resin key into it |
| Topcoat | Applied across the whole roof in one colour | Applied over the new work; a slight colour difference from weathered topcoat is normal |
On an older covering the survey looks hard at the laminate before anything is cut. If it is sound, well bonded to the deck and still dry underneath, cutting in a lantern is straightforward. If the deck has softened or the finish has crazed across the whole roof, it makes more sense to lay a new covering and form the kerb as part of it, so the opening is not the only fresh work on a tired roof.
How the kerb and the laminate go together
The kerb is a timber frame sized to the lantern base, fixed down through the deck into the joists or the trimmers around the opening. On a GRP roof it is sheeted in board so the resin has a flat, solid face to bond to on every side. The order on the roof runs like this:
- Frame the opening. Joists are trimmed around the hole so the load of the glazing lands on doubled timbers, not on the deck boards.
- Build the kerb. The timber upstand is fixed square and level on top, since the lantern frame needs a true seat even though the roof itself falls.
- Trim the angles. Preformed GRP angle fillets go into the corner between deck and kerb so the mat is never folded tight into a sharp edge.
- Lay the mat. Resin and reinforcing mat run from the deck up the kerb sides and over the top edge, consolidated with a roller to drive out air.
- Topcoat and cure. Once the laminate has cured, the topcoat seals the finish, and the lantern is lifted on and fixed to the kerb.
Kerb height, and how the roof falls away from the upstand so water never sits against it, is covered in our guide to kerb height, falls and standing water. Resin is also sensitive to cold and damp while it cures, which is why the timing questions in can a roof lantern be fitted in winter? bite harder on a fibreglass roof than on some others.
What the survey checks on a GRP roof
We survey before quoting, and on this covering the useful checks are specific. Is the deck firm underfoot, with no bounce or soft spots between joists? Does the laminate sound solid when tapped, rather than hollow where it has lifted from the boards? Which way do the joists run relative to the lantern position, and does the roof already fall correctly to the gutter or outlet? Is there room for a kerb that keeps the glazing clear of the covering without the lantern sitting awkwardly high on a low extension?
The weight of the glazing is part of the same picture: a glass lantern bears on the kerb and the trimmed joists, so the timbers need to be right for it. Our answer to how heavy is a roof lantern? explains what that load looks like in practice.
The rule: the lantern goes on only once the laminate and topcoat have fully cured. The exception is timing, not method: in warm, dry weather the wait between laying the GRP and lifting the lantern is short, and in cold or wet spells it stretches, so the glazing is booked around the cure rather than the other way round.
Building Control and the finished detail
Cutting a new opening in a flat roof and trimming the joists is structural work, and a roof lantern is a controlled fitting under the thermal parts of the Building Regulations, so the job is notifiable. On our installations that notification is dealt with as part of the work rather than left for the homeowner to chase. Whether your particular job suits an application or a notice is set out in do roof lanterns need Building Regulations approval?
Inside, the opening is lined with plasterboard to form a clean shaft up to the lantern, and outside the kerb is finished in the same topcoat as the roof, so the upstand reads as part of the covering. The workmanship on the kerb, the laminate bond and the lantern fixing is backed by a 10-year guarantee, a promise on the work itself and not insurance backed.
Lantern, flat rooflight or skylight on a GRP roof
A fibreglass deck takes any of the flat roof glazing options, since every one of them sits on a kerb the laminate can climb. A lantern gives height and a sense of volume above a kitchen or dining space; a low flat rooflight or a fixed skylight keeps a quieter profile where the extension sits under bedroom windows. If you are weighing the two for a new extension, our guide to a roof lantern on a flat roof kitchen extension works through that choice for a typical estate house. When you want to know whether your own fibreglass roof is ready for one, arrange a survey and we will check the deck, the joists and the laminate before putting a figure on it.