Question answered · Flat roof rooflights

Can a flat rooflight be fitted from inside?

The short answer

Partly. The ceiling opening, any joist trimming and the finished reveal are all worked from the room below, but the rooflight itself sits on a kerb above the deck, and the waterproof membrane has to be dressed up that kerb and sealed from the roof side. So someone always has to stand on the roof, or reach it safely from a tower or scaffold, to make it watertight.

A flat rooflight over a single-storey kitchen extension

It is a fair thing to ask when the flat roof is over a single-storey kitchen, a garage or a link extension and nobody fancies ladders on the lawn. Our flat roof rooflight installation work is split between the two sides of the deck, and knowing which jobs belong where tells you what access the day will need and why.

What follows goes through the inside work, the outside work, and how access is usually arranged on the extensions and garages found around Basingstoke.

Why the weatherproofing can only be done from above

A flat skylight is never glazed flush into the deck. It sits on a raised upstand, either a timber kerb built on site or a factory kerb supplied with the unit, and the roof covering is taken up the sides of that upstand and finished under the rooflight frame. Rain meets the membrane first, runs to the falls and never reaches the joint between glass and timber. Every one of those layers faces the sky. You cannot bond felt, GRP or a rubber membrane to a kerb from underneath it, any more than you could tile a roof from the loft.

How the two kerb types compare is set out in our guide to a timber upstand or a factory kerb, and the short reason a kerb is always there is answered in does a flat rooflight need a kerb?

Flat rooflight on an insulated upstand A section through a flat roof. Joists carry firrings, a deck, insulation and a waterproof membrane that falls towards a gutter at the edge. Around the opening an insulated timber upstand rises above the roof, the membrane is dressed up it and sealed under the rooflight frame, and the double glazed rooflight sits on top with a slight fall so rain runs off the glass. Inside, plasterboard lines the reveal of the opening down to the ceiling of the room below. OutsideRoom below12345678

Flat rooflight on an insulated upstand

  1. Double glazed rooflight, set to a slight fall so rain runs off the glass
  2. Upstand (kerb): a timber kerb with insulation on its outer face
  3. Membrane dressed up the upstand and over the top, sealed under the rooflight frame
  4. Waterproof membrane covering the roof, falling towards the gutter outlet
  5. Insulation laid over the deck, keeping the structure warm
  6. Roof deck on tapered firrings, which create the fall
  7. Joists, trimmed around the opening with trimmer joists
  8. Plasterboard reveal lining the opening, meeting the ceiling below

The work that happens from the room

A good share of the job is done indoors, and on a finished extension this is where the dust and the careful cutting happen.

Which side of the deck each part of the job is done from
TaskFrom insideFrom the roof
Marking out the openingSet out on the ceiling between the joists, clear of lights and cablesChecked against the falls and any outlets
Cutting the ceilingPlasterboard taken out and the void exposedNot involved
Trimming joistsTrimmers fixed from below where a joist is cutDeck cut to match the trimmed opening
Kerb and membraneNot possibleUpstand fixed, covering dressed up it and sealed
Setting the rooflightNot possibleUnit lifted onto the kerb and fixed down
Reveal and finishLined, insulated, plastered and decoratedNot involved

The reveal is the part you look at every day, so it gets the same care as the glazing. Whether its sides run square or angle outwards to spread the light is a choice covered in our guide to splayed or square reveals.

Cutting the deck without wrecking the ceiling

On an existing flat roof the order matters. The opening is usually marked and cut through the ceiling first, so the joists can be seen and the exact position fixed before anything is opened to the weather. The deck and covering are then cut from above to line up with it, the upstand goes on and the membrane is dressed up its faces on the same visit, so the room is never left open overnight. If a joist sits where the glass needs to be, the trimming is fixed from below while the roof is still whole.

The rule: once the deck is cut, the roof side is finished before anyone leaves. The exception is weather: if rain arrives mid-job the opening is sheeted and weighted from above, which again means working on the roof.

Whether a trimmed joist leaves the deck weaker is answered in will a flat rooflight weaken my flat roof?

Getting onto the roof safely

A single-storey flat roof is low, but working at its edge still needs proper access. On a rear kitchen extension a mobile tower on the patio usually does it. On a garage or a link between a house and its neighbour, where the only way up is over a driveway, a short run of scaffold or a tower on the drive is more typical. Two-storey flat roofs over a back bedroom need full edge protection. The glazed unit itself can be heavy, and on a large single pane it is lifted onto the kerb by two people or with lifting gear from outside.

The survey looks at all of this: where a tower can stand, whether a neighbour's side is involved, and how the unit reaches the roof. Access is costed into the written quote rather than left as a surprise on the day.

What changes with the roof covering

How the membrane meets the kerb depends on what the roof is made of. A felt roof is dressed up the upstand in layers, GRP is laid and bonded up the faces, and a single-ply rubber roof is taken up and fixed at the top edge. Each one is a roof-side job with its own detailing, and the choice of kerb follows from it. Felt in particular raises questions of its own, answered in can a flat rooflight go on a felt roof?

  1. Look first. The ceiling, the joist direction, the covering and the access are all checked, and the size that suits the room is confirmed.
  2. Inside first. Opening set out and cut through the ceiling, joists trimmed if needed, dust sheets down.
  3. Roof side. Deck cut, kerb fixed, covering dressed and sealed, rooflight set down on the upstand.
  4. Finish below. Reveal lined, insulated and plastered, ready for decoration.

The paperwork either way

Cutting into a roof and fitting new glazing to a heated room is notifiable, whichever side most of the work comes from, so the Building Control side is arranged by us as part of the job. The finished installation carries a 10-year workmanship guarantee, which is not insurance backed. Neither depends on who stood where.

To see how your extension or garage roof can be reached and which parts of the job will happen in the room, arrange a survey and we will walk the roof and the ceiling with you before any quote is written.

Free roof survey

Tell us about your roof

  • Survey before any quote
  • No obligation
  • Plain-English advice

Say what you have in mind and where. We survey the roof before we quote, then tell you plainly what fits.

Prefer to talk? 01256 213206

Request my survey