People often mix up the two consents, so it helps to pull them apart early. Planning is about how the house looks from outside. Building Regulations are about whether the work is safe, warm and sound. A new roof window on the back slope of a Brighton Hill semi may need no planning application at all, yet it still sits squarely inside the Regulations. Our roof window installation page sets out the whole job from survey to finished lining; this answer deals only with the Regulations side.
Which parts of the Regulations a roof window touches
The Building Regulations are split into Parts, each covering one subject, with Approved Documents that explain how to meet them. A roof window is a small job on paper, but it crosses several of those Parts at once.
| Part | Subject | Where a roof window meets it |
|---|---|---|
| Part A | Structure | The opening in the rafters or trusses, and any trimming around it |
| Part B | Fire safety | An escape window in a habitable loft room, where one is required |
| Part C | Resistance to moisture | Weathering at the flashing and the underlay around the frame |
| Part F | Ventilation | Background and purge ventilation when the window serves a room |
| Part L | Conservation of fuel and power | The thermal standard of the glazed unit and the insulation made good around it |
Not every Part bites on every job. A small fixed skylight over a landing will never be an escape route, for example. The table simply shows why Building Control cares about something that looks, from the street, like a pane of glass in the tiles.
Sizing a roof window to the truss bays
- Fink trussed rafter, factory made and designed to work as one whole frame
- W-shaped webs, joined at every node by pressed metal nail plates
- Tile covering on battens over the underlay
- Roof window set in the slope, fitted between trusses so the frame is untouched
- Narrow roof window sitting in the bay between two trusses
- Trusses at even 600mm centres along the roof
- No truss cut: the trusses either side of the window stay whole
- A wider window crosses a truss, so the cut needs designed trimming from an engineer or the truss maker
Why the structure is the part that matters most here
On the trussed estates that make up most of Basingstoke, the structural question is the one that decides the route. A roof window sized to sit between two trusses leaves the engineered roof untouched: only the battens, the underlay and the covering are opened. A wider rooflight that means altering a truss is a structural change, and it needs a written design before anyone cuts. Building Control will want to see that design as part of the notification.
Older cut rafter roofs in places like Old Basing or Overton are trimmed with doubled rafters and trimmers, a long-established carpentry method, but the opening is still structural work and is still notified. Whether your particular opening calls for an engineer's calculation is answered in does a roof window need a structural engineer?, and the fuller picture of how trimming carries load around a gap lives in the guide on when a wider roof window needs designed trimming.
The rule: any new opening in a pitched roof is notifiable, however small the window. The exception worth knowing is a straight swap of an existing roof window into the same opening, which is treated as a replacement window and follows its own route, described below.
Replacing a roof window you already have
Swapping a tired or misted unit for a new one in the same hole is simpler in structural terms, since nothing in the roof moves. It is still controlled work, though: a replacement window has to meet the current thermal standard in Part L, not the standard it was built to decades ago. That is usually good news, because the new unit will be warmer than the old one.
Replacement glazing can be certified in one of two ways: by an installer registered with a competent person scheme, who self-certifies, or by a notification to the local authority's Building Control team, who inspect. Either route ends with a certificate the homeowner keeps. Everlight uses the Building Control route and submits that notification on the owner's behalf, so the paperwork is in place before the first tile comes off.
Loft conversions change the scale of the question
A roof window going into an existing loft conversion, or into a new one, pulls more of the Regulations in. If the loft becomes a habitable room, Part B may need a window that works as an escape route, sized and positioned so a person can get out and be reached. That affects the window type and its sill height, and it is decided before the window is ordered, not after.
The detail of escape sizes and positions is covered in our guide to roof windows as a means of escape in a loft room. Where the roof window is one part of a larger conversion, the conversion's own Building Control application normally covers it, and the window specification is agreed to fit that application.

How the notification works in practice
For a straightforward roof window, the usual route is a building notice to the local authority before work starts, rather than a full plans application. The sequence looks like this.
- Survey. We look at the roof first, confirm trussed or cut rafters, and measure the spacing where the window will sit.
- Specification. The window size, glazing and any trimming are fixed, with a design where the structure is altered.
- Notice. The notification goes to the Building Control team for your council, for example Basingstoke and Deane Borough Council or Hart District Council, with the design attached where one is needed.
- Inspection. Building Control may visit during the work, typically to see the opening and the insulation before the lining closes it up.
- Certificate. Once the work is signed off, a completion certificate is issued. Keep it with the house deeds, because a buyer's solicitor may ask for it.
What happens if a roof window was fitted without it
If you are buying or selling a house with a rooflight that went in without Building Control, the missing certificate tends to surface at conveyancing. Councils can offer a regularisation route for unauthorised work, which may involve opening up parts of the job for inspection. Solicitors sometimes suggest indemnity insurance instead. Neither is as tidy as having the certificate in the first place, which is the whole argument for doing it properly at the start.
Planning, by contrast, is a separate check with a separate answer. For most rear slopes a roof window falls within permitted development, but conservation areas, front slopes and listed buildings change that. Our answer to do roof windows need planning permission? goes through those cases.
Infographic
Planning and Building Control: the questions in order
Is the house listed?
Yes: listed building consent is needed before any rooflight goes in.
No: next question.
Is it in a conservation area, or a flat or maisonette?
Yes: check with the council. A conservation-style rooflight is often the expected choice.
No: next question.
Will it sit within permitted development limits?
Usually yes when it projects no more than 150mm from the roof plane and stays below the highest part of the roof.
If not: a householder planning application.
Is the work notifiable under the Building Regulations?
A new rooflight, or a replacement that changes the structure, is. We notify Building Control for you.
Either way the glazing must meet current thermal standards.
What this means for your job
On a practical level, Building Regulations add a notification, an inspection or two and a certificate. They also add confidence: a record that the roof was opened properly, the insulation was reinstated and the window meets today's thermal standard. The job itself is backed by our 10-year workmanship guarantee, which is not insurance backed, and the Building Control paperwork sits alongside it.
If you are planning several openings across the house, the skylight and rooflight installation overview is the place to see how the pieces fit together. For a single roof window, the quickest way to know which route applies is to let us look: arrange a roof survey and you will get the answer in writing with the quote.