Question answered · Roof windows

How long does it take to fit a roof window?

The short answer

A straightforward roof window that sits between the trusses, going into an open loft with good access, is normally a single working visit from opening the tiles to a weathertight window. What stretches it is anything around the window rather than the window itself: designed trimming, scaffold, plastering and decorating the reveals, or a Building Control inspection that has to fall at the right moment.

A loft study lit by a top-hung roof window

The honest answer to "how long" depends less on the window than on the roof and the room it goes into. On our roof window installation page the whole job is laid out from survey to finish; this answer pulls out just the timing, so you can plan a loft clearance, a day off work or a decorator around it.

It helps to split the time into three parts: the wait before anyone arrives, the hours on the roof, and the finishing inside afterwards. Only the middle part is the fitting itself, and it is usually the shortest.

What happens on the fitting day

For a window between two trusses on a concrete tiled estate roof, the working day follows a familiar pattern, and the roof is only open for part of it.

  1. Protect and prepare. Dust sheets go down along the route to the loft, and the opening is marked from inside against the trusses so it lands where it was agreed at survey.
  2. Open the roof. Tiles or slates come off around the position, the felt or membrane is cut back and the battens are trimmed to form the aperture.
  3. Frame and set. The window frame is fixed to the timbers at the correct height, checked for square and level, and the sash goes in.
  4. Weatherproof. The underfelt collar and the flashing kit for your covering are fitted, and the tiles are cut and relaid around them. From here the roof is closed.
  5. Tidy. Offcuts, old battens and dust leave with us, and the window is shown to you working before we go.

Weather matters for the open part of that sequence, so the day is planned around a dry forecast. If you are wondering about the colder months, our answer on whether roof windows can be fitted in winter explains how that is handled.

Sizing a roof window to the truss bays On the left, a section through a pitched roof built from Fink trussed rafters, with W-shaped webs joined by nail plates, tiles on battens, and a roof window set in the slope. On the right, the same slope seen square-on: trusses at even 600mm centres with a narrow roof window sitting in the bay between two of them, so no truss is cut. A wider window outline, drawn dashed, crosses a truss and would need designed trimming. Section600mm centresSeen square-on12345678

Sizing a roof window to the truss bays

  1. Fink trussed rafter, factory made and designed to work as one whole frame
  2. W-shaped webs, joined at every node by pressed metal nail plates
  3. Tile covering on battens over the underlay
  4. Roof window set in the slope, fitted between trusses so the frame is untouched
  5. Narrow roof window sitting in the bay between two trusses
  6. Trusses at even 600mm centres along the roof
  7. No truss cut: the trusses either side of the window stay whole
  8. A wider window crosses a truss, so the cut needs designed trimming from an engineer or the truss maker

Jobs that take longer, and why

The table sets out the common variations and what each one adds to the programme. It describes the reason, not a promise of hours; your quote gives the timing for your roof.

What changes the length of a roof window job
SituationWhat it addsWhy
Window between the trussesNothing beyond the normal fitting dayThe trusses stay whole and only battens and covering are opened
Wider window needing trimmingDesign time before the job, and more work inside the roof on the dayTrimmers must be built to the design before any truss member is cut
Two windows side by sideA longer fitting, often still one visitTwo apertures, two flashing kits, and matched heights
High or awkward roofScaffold erected before and struck afterSafe access comes first on a tall elevation or over a conservatory
Clay tile or natural slateExtra care on the roofOld tiles and slates are lifted and reused rather than broken
Finished room belowA separate finishing stageLinings, plaster and paint need drying time between coats

Designed trimming is the biggest single change to the timetable, because the engineering sits in front of the fitting. How that design is produced, and when a wider skylight genuinely needs it, is covered in our guide to when a wider roof window needs designed trimming.

Access decides a surprising amount

On a two storey semi in Brighton Hill or Chineham, the rear slope can usually be worked from ladders and roof ladders, and nothing needs to go up in advance. A three storey townhouse, a roof above a conservatory or a steep front slope onto a pavement is a different case: scaffold goes up first and comes down after, and that belongs in the programme even though no one touches the window on those days.

Sometimes the whole job can be done from the loft side, which keeps things simpler. Whether yours is one of those is answered in can a roof window be fitted from inside?

Finishing inside the room

A new rooflight is weathertight when the roofers leave, but the room below may not look finished. In an unconverted loft there is nothing more to do. In a bedroom, a landing or a converted loft, the opening needs insulating, lining and plastering, and plaster has to dry before it is painted. That is where calendar days appear that have little to do with the roof.

Plan for this: the window can be in and sealed long before the reveal is ready to decorate. If you want the room back in use quickly, ask for the linings to be part of the same visit. The exception is fresh plaster, which simply needs time to dry.

The options for the inside finish, from factory lining kits to plastered reveals splayed for more light, are in our guide to roof window linings and reveals.

Paperwork around the dates

Adding a roof window on a house normally involves Building Regulations, and a wider opening that alters the structure certainly does. That shapes timing in two ways: notice goes in before the work starts, and an inspection may need to fall while the trimming is still visible. We deal with the notification and fit the dates around it. The detail of what applies is in do roof windows need Building Regulations approval?

Planning is a separate matter, and only comes into the timeline in some cases, such as a front slope in a conservation area like Old Basing. If it applies, it sits well before any fitting date.

Infographic

How a rooflight job runs, from survey to guarantee

  1. Roof survey

    We look at the structure, the covering and the room below before anything is priced.

  2. Specification

    A size, type and position that fits your roof, and whether the work is notifiable.

  3. Paperwork

    Building Control notified where the work needs it, and planning checked where it applies.

  4. Installation

    Opening formed, frame fixed, flashed or dressed in, then lined and finished inside.

  5. Sign-off and guarantee

    Completion paperwork where needed and a 10-year workmanship guarantee.

How to keep your job short

Most of the delay on the day comes from surprises, and the survey is there to remove them. Before quoting, we check the truss spacing where you want the skylight, the pitch, the covering and the access, so the right window, flashing and equipment arrive together. A clear loft floor under the opening and a parking space near the house help too.

Your finished window carries a 10-year workmanship guarantee, not insurance backed. To get a timing that belongs to your roof rather than a general one, ask us to survey it and the quote will set out each stage.

Free roof survey

Tell us about your roof

  • Survey before any quote
  • No obligation
  • Plain-English advice

Say what you have in mind and where. We survey the roof before we quote, then tell you plainly what fits.