Question answered · Roof lanterns

Does a roof lantern need a structural engineer?

The short answer

Sometimes, and the deciding factor is the flat roof underneath, not the lantern. A lantern dropped into a brand new extension roof built with a trimmed opening already on the drawings rarely needs anyone new. Cutting an opening through the joists of an existing flat roof is a structural alteration, so the trimmers carrying those cut joists should be sized by a structural engineer, and Building Control will want to see how.

A roof lantern over an open-plan kitchen extension

Put simply, a roof lantern is a glazed box that sits on a timber kerb, and the kerb sits on the roof deck around a hole. Everything that matters structurally happens at that hole. Our roof lantern installation work begins by establishing which of two situations you are in: the opening is part of a roof still being designed, or it has to be made in a roof that is already built and finished.

New extension or existing flat roof?

On a kitchen or garden room extension that is still on paper, the roof joists, any steel beam and the lantern opening are usually worked out together. If the extension already has structural calculations for Building Regulations, the opening and its trimmers belong in that same set of drawings. Adding the lantern at that stage means the joists are laid out around it from the start, and nothing has to be cut later.

An existing flat roof is the harder case. Here the joists already run unbroken from wall to wall, and making room for a glazed rooflight means cutting through some of them. Those shortened joists then hang from new trimmers, and the trimmers pass the load back to the joists that stay whole. How big those timbers must be, and how they are fixed, depends on the span, the joist size and the opening, which is exactly the sum an engineer is there to do.

Where the engineering question usually lands
SituationWhat changes in the roofWho usually sizes it
New extension, lantern on the plansJoists laid out around a framed opening from day oneThe engineer or designer already producing the extension calculations
Existing roof, opening fits between joistsDeck and covering opened, joists left wholeConfirmed at survey; the kerb spreads the weight onto the joists either side
Existing roof, joists must be cutCut joists carried on new trimmers and doubled joistsA structural engineer, with the design sent to Building Control
Opening near a steel beam or wall plateLoads shift onto a member that already carries a lotA structural engineer, who checks the beam as well as the trimming
How a roof lantern sits on a flat roof A roof lantern drawn in elevation above a flat roof, with the roof cut away in section below. The glass panels are held by glazing bars running up to a central ridge, with hip bars at each end and a perimeter frame along the eaves. The frame sits on an insulated kerb, the flat roof covering is dressed up the kerb, and a plastered reveal lines the well that opens into the room below. Outside Room below 1 2 3 4 5 6 7 8

How a roof lantern sits on a flat roof

  1. Ridge, where the glazing bars meet at the top
  2. Hip bar, closing each sloped end of the lantern
  3. Glazing bar, holding the edges of the glass
  4. Glass panel, sealed double or triple glazed units
  5. Eaves or perimeter frame, which the whole lantern stands on
  6. Insulated kerb (upstand), raising the lantern clear of the roof
  7. Flat roof covering, dressed up the kerb and under the frame
  8. Plastered reveal, lining the lantern well into the room below

Why the joists decide it

Flat roof joists on a single storey extension span in one direction, usually from the house wall to the outer wall or onto a beam. A lantern is almost always wider than the gap between two joists, so a meaningful opening cuts at least one of them. Which way the joists run matters too: an opening laid out along the joists cuts fewer of them than the same opening set across them. That orientation question, and how the trimming is built, is covered properly in our guide to joist direction, trimming and the opening a roof lantern needs.

The lantern itself adds weight on top: glass, glazing bars and the ridge all bear down through the kerb onto the trimmers. Heavier double or triple glazed units add more. For how that load compares across sizes, see how heavy is a roof lantern?

The rule: any joist that is cut is only cut once its replacement support is designed and ready to go in. The exception is an opening that genuinely fits between joists, where nothing structural is cut and the survey confirms the joists either side can take the kerb.

What Building Control asks for

Forming a new opening in a roof and adding glazing is building work that Building Control needs to know about, and cutting joists makes the structural side part of that. The inspector will expect to see how the altered roof carries its loads, which in practice means calculations or a drawn detail for the trimming. Our answer on whether roof lanterns need Building Regulations approval goes through the wider approval question. On our installations, submitting that notification is our job, and any engineer's design travels with it.

How the job runs when an engineer is needed

  1. Survey. We open up enough to see the joist size, spacing and direction, find any beam or wall plate nearby, and note the deck and covering.
  2. Engineer's design. The engineer specifies the trimmers, any doubled joists, hangers and fixings, and confirms the bearings at each end.
  3. Notification. The design goes to Building Control with the notice of work before anything is cut.
  4. Trimming first. The new timbers are fixed in place, then the opening is cut and the kerb built on the framed hole.
  5. Lantern and weathering. The lantern is set on the kerb, the roof covering is dressed up the upstand, and the ceiling is lined back to the frame.

The engineer's part is usually a desk exercise plus the information from our survey, so it adds a step rather than a delay to the build itself. It does add to the price, which our answer on what a roof lantern costs to install lists among the factors that move the figure.

Signs your roof will need one

You can often guess before anyone visits. The larger the skylight you picture, the more joists it crosses, and the stronger the case for a design. An opening close to the house wall, where a steel or a wall plate takes the joist ends, needs checking. So does a roof that has already been altered, or one carrying something heavy such as an air conditioning unit. A roof lantern much bigger than the room below really needs tends to push all of these at once, which is one reason our answer on how big a roof lantern can be starts from the room rather than the product.

Flat roofed kitchen extension with a framed opening ready for a roof lantern kerb
New trimmers in place around the opening before the flat roof covering is dressed up to the kerb

The short version

A lantern going into a roof that is still being designed normally rides on the existing structural work. A lantern cut into an existing flat roof, where joists are cut, calls for a structural engineer to size the trimming, and the result goes to Building Control. If the opening happens to sit between joists, the survey can confirm that and no engineer is involved. Either way, the answer comes from looking at your actual joists, and the 10-year workmanship guarantee on our work (not insurance backed) covers the installation that follows.

Wondering which case your extension falls into? Arrange a survey of the roof and we will measure the joists and tell you plainly whether a design is needed before any quote.

Free roof survey

Tell us about your roof

  • Survey before any quote
  • No obligation
  • Plain-English advice

Say what you have in mind and where. We survey the roof before we quote, then tell you plainly what fits.

Prefer to talk? 01256 213206

Request my survey