Owners often picture the lantern pushed tight against the house, or floating dead centre on the extension, and neither is automatically right. On our roof lantern installation page we explain how a lantern job is planned from the roof structure outwards. This answer takes one narrow part of that planning, the gap between the lantern kerb and the wall of the main house, and explains what sets it.
Think of the flat roof as a tray with a raised frame sitting in it. The frame is the kerb the lantern bolts onto. Around that frame there has to be enough roof left to do its own jobs, and the side facing the house has the most jobs to do.
What the strip beside the house wall has to hold
Where an extension roof meets the older wall, the waterproof covering turns up the brickwork and is capped by a flashing let into a mortar joint (or a cavity tray above it). That junction is where a flat roof is most exposed to driven rain and to water running down the wall from the storey above. It needs room to be formed properly, and it needs to stay reachable in years to come.
If the lantern kerb is pressed too close, two upstands end up facing each other across a narrow channel: the wall abutment on one side, the lantern kerb on the other. Water, leaves and grit collect in that slot, and the covering has to be folded into a tight gap that is hard to dress and harder to inspect. A comfortable strip between the two keeps each detail separate and lets the roof drain past.
The rule: leave the house wall its own clear band of flat roof, so the abutment flashing and the lantern kerb never share a gutter. The exception: a lantern designed to butt the wall as a lean-to style glazed link is a different product with its own wall detail, and it is specified that way from the start.
How a roof lantern sits on a flat roof
- Ridge, where the glazing bars meet at the top
- Hip bar, closing each sloped end of the lantern
- Glazing bar, holding the edges of the glass
- Glass panel, sealed double or triple glazed units
- Eaves or perimeter frame, which the whole lantern stands on
- Insulated kerb (upstand), raising the lantern clear of the roof
- Flat roof covering, dressed up the kerb and under the frame
- Plastered reveal, lining the lantern well into the room below
How the joists move the lantern
A lantern needs an opening framed with trimmers, and that framing depends on which way the flat roof joists run. On a typical single storey extension the joists span from the house wall to the outer wall, or across between the side walls. The opening edges want to land on or beside a joist, with doubled joists and trimmers carrying the cut ends.
That can nudge the lantern a little towards or away from the house, because the kerb position is chosen to suit the joist layout rather than a tape measure from the wall. Where the joists hang off a wall plate or joist hangers on the house wall, the trimmers also need to stay clear of that bearing. How the opening is framed in each direction is set out in our guide to joist direction and trimming for a roof lantern, and whether the framing needs an engineer's calculation is covered in does a roof lantern need a structural engineer?
Falls, outlets and water from the main roof
A flat roof is laid to a gentle fall towards a gutter or outlet, usually away from the house. The lantern kerb is an island in that flow. Put it in the wrong place and it becomes a dam: water backs up on the house side, sits against the kerb and never quite clears. The position has to leave a clear path for water from the wall side to get round the kerb and away.
The main house matters here too. A gutter, downpipe or roof valley above the extension may discharge onto the flat roof, and a lantern sitting right under that spill takes the full force of it every time it rains. On a two storey estate house with the extension across the back, the eaves line above and any downpipe shoe are marked at survey so the lantern avoids them. The detail on kerb height and how the falls are kept working around a skylight of this kind lives in our guide to kerb height, falls and standing water.
| Factor | What it asks for | Who confirms it |
|---|---|---|
| Wall abutment | A clear band of roof for the upstand and flashing to be formed and later inspected | Installer, at survey |
| Joist direction | Opening edges landing on joists, trimmers clear of the wall bearing | Survey, and an engineer where the opening is large |
| Falls and outlets | A path for water from the house side to pass the kerb to the gutter | Installer, checking the existing falls |
| Water from above | Glass kept out from under downpipes, valleys and eaves drips | Installer, at survey |
| Room below | Daylight over the table, island or seating rather than over a wall of units | You, with the survey drawing |
The room underneath decides the rest
Once the roof has given its limits, the lantern is placed for the room. In a kitchen extension the light is usually wanted over the island or the dining table, not over the back of the old house wall where tall units or a doorway sit. Pulling the lantern off the wall a little often puts the glass exactly where people spend time, and it also keeps the lantern clear of the ceiling line where the new room meets the old one.
Blinds, a pendant light or a ceiling fan all need their own space inside the lantern opening or beside it, so it helps to know the layout before the position is fixed. Our guide to sizing a roof lantern to the room below covers how the size and the layout go together, and how big can a roof lantern be? covers the upper end.

Leaving room to reach it later
The same strip of roof beside the wall is where someone kneels to check the flashing, clear an outlet or wash the glass. A lantern jammed against the house leaves one face that is awkward to reach from anywhere. A little space on each side keeps every pane and every piece of flashing within reach from the roof or a ladder. How owners look after the glass without climbing where they should not is covered in how do you clean a roof lantern safely?
Planning is rarely driven by the wall gap, but height is. A lantern that rises well above the flat roof changes how the extension looks from next door, so its height and position are checked together. Any Building Control notification that goes with the new opening and the glazing is dealt with by us as part of the job.
How the position is fixed at survey
- Look up and down. We check the joist direction from inside where we can, the falls and outlets on the roof, and every gutter or downpipe above.
- Mark the no-go zones. The abutment band by the wall, the joist bearings, and anywhere water from the main roof lands.
- Place it for the room. Within what is left, we set the rooflight over the part of the room you want lit, and draw it with the distances from each wall.
- Confirm on paper. The position, kerb and trimming go into the written quote, so you can see where the lantern will sit before any cutting.
The answer to the question, then, is a measured one for each roof rather than a number from a brochure. If you have a flat roof extension and a spot in mind for the light, ask us to measure it and we will draw where the lantern can go.