That is the short version. The rest of this answer explains what fills the day, what stretches it, and how you can tell in advance which kind of job yours is. The time on site is only part of the picture: a replacement rooflight also has to be surveyed, specified and ordered, so it helps to know how the whole process fits together.
What happens on a one-day replacement
On a typical pitched roof, a like-for-like roof window replacement follows a set order. We protect the room and the route through the house first, because taking out an old window disturbs dust that has sat in the lining for years. The old sash and frame come out, the opening is checked, and the new frame is fixed in its place. The flashing kit that suits the tile or slate profile goes on, the underlay is dressed to the new frame so water is carried round it, and the tiles are relaid neatly around the flashing. Inside, the lining is made good where the old frame met it, and the room is cleaned before we leave.
When the new window matches the old opening, none of those steps involves changing the roof structure, which is what keeps the job to a day. If you want to understand every stage in more detail, our answer on how a skylight is installed, step by step walks through a new installation, and how a rooflight replacement day runs follows a replacement from arrival to sign-off.
Sizing a roof window to the truss bays
- Fink trussed rafter, factory made and designed to work as one whole frame
- W-shaped webs, joined at every node by pressed metal nail plates
- Tile covering on battens over the underlay
- Roof window set in the slope, fitted between trusses so the frame is untouched
- Narrow roof window sitting in the bay between two trusses
- Trusses at even 600mm centres along the roof
- No truss cut: the trusses either side of the window stay whole
- A wider window crosses a truss, so the cut needs designed trimming from an engineer or the truss maker
What makes a replacement take longer
| Situation | Why it adds time | What we do about it |
|---|---|---|
| A bigger window than the old one | The opening has to be enlarged, and on a trussed roof a wider opening needs a designed trimming detail before any truss is touched | We check the fit at survey and, where trimming is involved, have the detail designed before the day |
| Tired flashing or tiles around the old unit | More of the roof covering has to be lifted and relaid, and damaged tiles matched | We look at the covering at survey and include it in the quote rather than find it on the day |
| An old plastic dome on a flat roof | The dome often comes off with part of the upstand and the covering around it, which then has to be rebuilt and sealed | We specify a new rooflight to suit a new or existing kerb and allow for the flat roof work |
| Difficult access | A tall or steep roof may need a scaffold tower or scaffolding for safe working at height | We decide the access at survey so it is arranged before the work starts |
| A finished loft room | Plastered linings and decorated reveals take more care to make good than an open loft | We agree the lining finish at survey and protect the room carefully on the day |
None of these makes a replacement a long job in building terms. They are the reasons one skylight replacement is done by the afternoon and another runs into a second day.
Can the whole job be done from inside?
Some replacement roof windows can be fitted largely from inside the room or the loft, which can save time and avoid external access. Whether that works for your window depends on the product, the flashing and the state of the covering around it. We check it at survey rather than promise it in advance. There is more on this in our answer to can a skylight be replaced from inside?
Weather and the working day
Opening a roof is weather-sensitive. We plan the work so the roof is open for as short a time as possible and is always weathertight at the end of the day. If the forecast turns against us, we would rather move the date than leave a roof exposed, and we will tell you as early as we can.
The time before the work starts
The day on site is the part people picture, but a rooflight replacement starts earlier. First comes the survey, where we confirm the roof structure, measure the opening, look at the covering and the access, and check whether the work is notifiable. Then you receive a written quote. Once you go ahead, the window and its flashing kit are ordered to the sizes we measured, and we agree a date. Where the work is notifiable, we handle the Building Control notification, and the sign-off follows the installation.
- Survey. We look at the roof, the opening and the room, and tell you what fits.
- Quote. A written quote sets out the product, the work involved and anything that affects the time on site.
- Order and date. The rooflight is ordered to the measured size and we agree a day that suits you.
- Replacement day. Protection, removal, fitting, flashing, retiling and making good.
- Sign-off. Building Control where the work needs it, then your 10-year workmanship guarantee.
How to tell which kind of job yours is
A few questions give a good idea before anyone visits. Is the new window the same size as the old one? Is the roof covering around it in good order? Can the roof be reached safely from inside or from a ladder, or is it high above a conservatory or a steep drop? Is it a pitched roof window or a flat rooflight? If the answers are the same size, sound covering, easy access and a pitched roof, the replacement is likely to be a one-day job. Our guide to choosing like for like or an upgrade helps if you are unsure whether to keep the same size.
Going bigger changes the answer. On an estate house with trussed rafters, a wider window than the old one is no longer a straight swap. Read going bigger when a roof window is replaced before you decide.
Infographic
How a rooflight job runs, from survey to guarantee
Roof survey
We look at the structure, the covering and the room below before anything is priced.
Specification
A size, type and position that fits your roof, and whether the work is notifiable.
Paperwork
Building Control notified where the work needs it, and planning checked where it applies.
Installation
Opening formed, frame fixed, flashed or dressed in, then lined and finished inside.
Sign-off and guarantee
Completion paperwork where needed and a 10-year workmanship guarantee.
Living in the house on the day
You can stay at home while a rooflight is replaced. The room under the window is out of use while we work, and there will be some noise when the old frame comes out and the tiles are cut. We keep the rest of the house protected and tidy. Our guide to dust, protection and the room afterwards explains what to expect and how to prepare the room.
For the wider picture of skylight and rooflight replacement in Basingstoke, including when a replacement is worth doing and what the fit check means for your roof, see our main guide to skylight and rooflight installation and replacement. To find out how long your own replacement will take, book a roof survey and we will tell you plainly.