So the fitting time is mostly decided before anyone arrives, by the roof and the loft between the dome and the ceiling. Our sun tunnel installation page covers the whole job; this answer looks only at the clock: what happens on the day, in what order, and which details turn a one-day fit into something longer.
It also helps to separate two kinds of time. There is the time spent at your house, which is short, and the lead time before it, which depends on the survey, the kit and, now and then, a Building Control notification. Homeowners tend to picture only the first.
What happens on the day, in order
A sun tunnel job runs in a fixed sequence, because each stage depends on the one before. Inside and outside work overlap, so the room below is only disturbed for part of the day.
- Setting out. We confirm the diffuser position on the ceiling and the dome position on the roof, and check the line between them in the loft.
- The ceiling opening. A neat circular hole is cut in the plasterboard between two ceiling ties, with dust sheets down in the room below.
- The roof opening. A few tiles are lifted, the battens are trimmed for the tube, and the flashing base is fitted to suit the covering, whether concrete tile, clay tile or slate.
- The tube. Rigid sections or a flexible tube are joined between the flashing collar and the ceiling ring, sealed at each joint and insulated through the cold loft.
- The dome and diffuser. The dome goes on outside, the tiles are dressed back around the flashing, and the diffuser clips into the ceiling ring.
- Clearing up. Offcuts and packaging leave with us and the room is left as it was, with one new circle of daylight.
On a trussed estate roof, where the tube drops cleanly between trusses at 600mm centres, that sequence rarely has any surprises in it. The survey has already told us where the webs and binders sit.
How a sun tunnel brings daylight down
- Clear dome on the roof slope, catching daylight from the sky
- Flashing, weathered into the tiles so rain runs round the dome
- Daylight reflecting off the mirror-finish lining all the way down
- Reflective tube, here a rigid straight run through the loft
- Loft insulation laid up to the tube, with an insulated sleeve round it to limit condensation
- Ceiling diffuser, spreading the light across the landing below
- Shown faint: angled elbows let the tube step round a truss or purlin, at some loss of light
What adds time to a sun tunnel fit
The things that lengthen a fit are nearly all about access and route. The table sets out the usual ones and why each costs time.
| Factor | Why it takes longer | Where it comes from |
|---|---|---|
| Long or bent route | More tube sections to join, seal and support, and elbows to set at the right angle | A dome placed away from the room to reach a better slope, or obstacles in the loft |
| Crowded loft | Boxes, boarding or a water tank must be moved or worked around before the tube can go in | Storage lofts and older plumbing layouts |
| Flat roof | An upstand is built and the membrane is dressed up to it before the dome is fitted | Single storey extensions, garages and dormers |
| Room above | The tube is boxed in through the upper room and the boxing is finished | Ground floor rooms under a first floor |
| Several tunnels | Each one has its own roof and ceiling opening, though they share the setting up | Long hallways or larger deep plan rooms |
A bend is the most common extra. If the loft route has to kink around a purlin or a tank, the detail is in can a sun tunnel bend around obstacles in the loft? Where the tube has to pass through a first floor room, can a sun tunnel pass through a room above? explains the boxing that goes with it.
Flat roofs and roofs without a loft
On a flat roof the tube is short, which saves time inside, but the roof side takes more work: an upstand is formed, the covering is lapped and sealed up its sides, and the dome sits on top so water runs past it. The method, and the choice between a pitched and flat dome base, belongs to our guide to sun tunnels on flat roofs. Where there is no loft at all, as under a vaulted ceiling or an extension with a warm roof, the tube may be very short, and the work concentrates at the ceiling line and the roof covering.
The rule: a straightforward pitched roof with a clear loft is a one-day job. The exception: a flat roof with an older covering can need the covering around the opening renewing first, and that is agreed at the survey so it is planned into the day rather than found on it.
The time before fitting day
Most of the calendar time sits before the fit. We look at the roof before we quote: the covering, the pitch, the orientation, the loft route and the ceiling below, so the quote and the plan for the day match the real house. Tube kits in standard diameters are commonly held by suppliers, while longer runs, extra elbows or a particular flashing for a slate roof can take a little longer to arrive.
Paperwork can add a step too. Whether a sun tunnel is notifiable depends on the work involved, and do sun tunnels need Building Regulations approval? sets out when that applies. Where a notification is needed, we send it, so there is nothing for you to arrange.
Sun tunnel, skylight or rooflight: how the times compare
A sun tunnel is the quickest of the daylight options because the openings are small and round. A roof window or skylight in the same roof needs a larger rectangular opening, linings, and usually plastering and decoration afterwards, while a flat roof rooflight involves an upstand as large as the glazing. If you are weighing those choices for a room, the time on site is one fair point in the sun tunnel's favour, though the right answer depends on the space; the comparison is laid out in sun tunnel or roof window: which suits the space.
Infographic
How a rooflight job runs, from survey to guarantee
Roof survey
We look at the structure, the covering and the room below before anything is priced.
Specification
A size, type and position that fits your roof, and whether the work is notifiable.
Paperwork
Building Control notified where the work needs it, and planning checked where it applies.
Installation
Opening formed, frame fixed, flashed or dressed in, then lined and finished inside.
Sign-off and guarantee
Completion paperwork where needed and a 10-year workmanship guarantee.
What you need to do to get ready
Very little. Clear a path to the loft hatch and a space under it, move anything fragile from the room where the diffuser goes, and make sure there is somewhere to park a van near the house. Once the dome is on and the diffuser is clipped in, the room can be used as normal, and the 10-year workmanship guarantee on the fitting starts from that day.
If you want to know how long your own roof will take, the fastest way is for us to see it. Arrange a survey of the roof and loft and we will tell you whether it is a one-day fit and, if not, exactly what adds to it.