Usually, yes. Cutting a new opening in a flat roof for a roof lantern alters the roof structure and adds controlled glazing, so it is building work that must meet the Building Regulations and be notified to Building Control before it starts. On a new extension the lantern simply forms part of that extension's application. We deal with the notification, so the approval paperwork is not left to you.

A roof lantern over an open-plan kitchen extension

That short answer covers most kitchen extensions and garage roofs around Basingstoke, but the reason behind it matters, because it tells you which parts of the regulations the lantern has to satisfy and what the inspector will want to see. Our roof lantern installation page sets out the whole job; this page stays on the approval question alone.

Keep two separate systems apart from the start. Building Regulations deal with how the work is built: structure, heat loss, weather and ventilation. Planning deals with whether the change is allowed at all and how it looks. A lantern can need one, both or, rarely, neither, and the two are easy to confuse because both involve the council.

Why a new lantern counts as building work

A flat roof is a set of joists spanning from wall to wall, each carrying its share of the deck, the covering and any snow load. A lantern needs a hole through that deck, and a hole of any useful size means cutting one or more joists and adding trimmers to carry their ends. That is a structural alteration, and structural alterations sit squarely inside the regulations.

The glazing adds a second reason. A roof lantern is a rooflight in the eyes of Approved Document L, and a new area of glazing in the thermal envelope of a house has to reach the standard the current edition sets for that element. So even a small lantern on an existing roof brings in two separate checks: will the roof still stand up, and will the new skylight keep the heat in to the required level.

The rule: cutting a fresh opening in an existing flat roof and fitting a lantern is notifiable. The exception is a lantern built into a brand new extension, where it is not a separate notification at all: it is drawn on the extension plans and inspected as part of that project.

How a roof lantern sits on a flat roof A roof lantern drawn in elevation above a flat roof, with the roof cut away in section below. The glass panels are held by glazing bars running up to a central ridge, with hip bars at each end and a perimeter frame along the eaves. The frame sits on an insulated kerb, the flat roof covering is dressed up the kerb, and a plastered reveal lines the well that opens into the room below. Outside Room below 1 2 3 4 5 6 7 8

How a roof lantern sits on a flat roof

  1. Ridge, where the glazing bars meet at the top
  2. Hip bar, closing each sloped end of the lantern
  3. Glazing bar, holding the edges of the glass
  4. Glass panel, sealed double or triple glazed units
  5. Eaves or perimeter frame, which the whole lantern stands on
  6. Insulated kerb (upstand), raising the lantern clear of the roof
  7. Flat roof covering, dressed up the kerb and under the frame
  8. Plastered reveal, lining the lantern well into the room below

Which parts of the regulations apply

The regulations are grouped into Parts, each with its own Approved Document. Only a handful bear on a lantern, and each one asks a different question of it.

The Parts of the Building Regulations a roof lantern touches
PartWhat it coversWhat it asks of the lantern
Part AStructureThat the trimmed opening carries the roof, the lantern's own weight and snow load safely
Part LConservation of fuel and powerThat the glazed unit and its upstand meet the thermal standard for a rooflight
Part CResistance to moistureThat the kerb and the roof covering around it keep the weather out
Part FVentilationThat the room still has adequate ventilation, which an opening vent can help provide

Of these, Part A is the one that shapes the installation most. Which way the joists run, and how many have to be cut, decides the trimming, and our guide on joist direction and trimming for a roof lantern goes through that in full. Whether the trimming needs an engineer's calculation is its own question, answered in does a roof lantern need a structural engineer?

Swapping an old lantern for a new one

Replacing an existing lantern in the same opening is a lighter case, though still not a free one. The structure has already been trimmed, so Part A usually has little to say unless the new unit is heavier or the opening changes size. The glazing, however, is a controlled fitting: a replacement rooflight must meet the Part L standard for replacement glazing, and the work has to be either self-certified by a registered competent person or notified to Building Control.

This matters most on the older extensions found on 1970s and 1980s estate houses in Popley, Brighton Hill or Oakridge, where the original lantern was often a polycarbonate unit. Changing it for glass also changes the weight on the kerb, which can bring the structure back into the conversation. Our answer on whether an old polycarbonate lantern can be swapped for glass covers that swap in detail, and what glass goes into a roof lantern explains the units that reach the thermal standard.

How the approval actually happens

For a lantern on an existing roof, the route is a building notice or a full plans application to the council's Building Control team or to an approved inspector. The steps run in a fixed order.

  1. Survey. We look at the roof first, measuring the joists, their direction and the deck, before any price is given.
  2. Specification. The lantern, the kerb, the trimming and the glass are chosen to fit the opening and to meet Parts A and L.
  3. Notification. Building Control is told about the work before it begins; we submit this on your behalf.
  4. Inspection. The inspector may look at the trimmed opening before it is closed in, so the timing is built into the programme.
  5. Completion certificate. Once the work is signed off, the council issues the certificate you keep with the house deeds.

That certificate is the part people forget until they come to sell. A buyer's solicitor will ask for it for any lantern added after the house was built, and a missing one can hold up a sale while retrospective approval is sought.

Where planning fits in

Planning is a different question with a different answer. On many houses a lantern on a single storey rear extension falls within permitted development, provided it does not rise too far above the roof plane and the house is not in a conservation area or subject to an Article 4 direction or conditions that remove those rights. Old Basing, Odiham and Overton all have conservation areas where that assumption cannot be made. The full picture, and when it is worth asking the council first, is in our guide to roof lanterns and permitted development.

Across the Basingstoke area, Building Control and planning for most homes sit with Basingstoke and Deane Borough Council, while Hook, Fleet and Odiham fall to Hart District Council. The two approvals are handled by separate teams, so clearance from one says nothing about the other.

Infographic

Planning and Building Control: the questions in order

  1. Is the house listed?

    Yes: listed building consent is needed before any rooflight goes in.

    No: next question.

  2. Is it in a conservation area, or a flat or maisonette?

    Yes: check with the council. A conservation-style rooflight is often the expected choice.

    No: next question.

  3. Will it sit within permitted development limits?

    Usually yes when it projects no more than 150mm from the roof plane and stays below the highest part of the roof.

    If not: a householder planning application.

  4. Is the work notifiable under the Building Regulations?

    A new rooflight, or a replacement that changes the structure, is. We notify Building Control for you.

    Either way the glazing must meet current thermal standards.

A general guide to the order of questions, not advice on a particular house. We check your position at the survey.

What this means before you book

If your extension is still on the drawing board, ask your architect or designer to show the lantern on the plans, so it goes through with everything else. If the extension already exists and you want daylight in a dark kitchen or dining space, expect the lantern to need its own notification, since the opening is cut into a roof that was never designed with a hole in it. Our fitting work comes with a 10-year workmanship guarantee, which is not insurance backed, and the approval sits alongside it as part of the same job.

The quickest way to know which route your roof needs is to have the joists and the existing covering looked at. Arrange a survey of your flat roof and you will have the regulations question answered alongside the specification.

Free roof survey

Tell us about your roof

  • Survey before any quote
  • No obligation
  • Plain-English advice

Say what you have in mind and where. We survey the roof before we quote, then tell you plainly what fits.

Prefer to talk? 01256 213206

Request my survey