Question answered · VELUX windows

Do I need to double up rafters for a VELUX window?

The short answer

Only when a timber has to be cut. If the VELUX window drops into the gap between two rafters or trusses and leaves every one of them whole, nothing needs doubling. Once a rafter is cut short to make room, the rafters either side are normally doubled and trimmers are fitted above and below the opening. On a trussed roof, that trimming is built to a written design.

A blackout blind fitted to a roof window

Doubling up is the carpenter's answer to a missing piece of roof. Take a length out of one rafter and its share of the tiles, battens and wind load has to go somewhere, so the timbers beside the gap are thickened to carry it. Whether your roof window needs that depends on two measurements: the width of the window and the space between your timbers. Our VELUX window installation service starts from those two numbers, because they decide whether the job is a simple fit or a structural one.

When no rafter is touched

VELUX frames come in a range of widths, and the narrower ones are made to sit inside the bay between timbers at standard spacing. Where the frame fits the bay, the installer opens the tiles and battens, fixes the window to the rafters on each side with its brackets, and fits a trimmer only where the head and sill need something solid to finish against. The rafters themselves stay full length and carry exactly what they carried before, so there is nothing to double.

That is why the width choice matters so much on an estate roof. A taller window in a narrow width can bring in plenty of daylight without asking the structure for anything. The widths that suit 600mm trusses are set out in our guide to VELUX sizes that fit between trusses, and the full list of codes is in what are the standard VELUX window sizes?

Sizing a roof window to the truss bays On the left, a section through a pitched roof built from Fink trussed rafters, with W-shaped webs joined by nail plates, tiles on battens, and a roof window set in the slope. On the right, the same slope seen square-on: trusses at even 600mm centres with a narrow roof window sitting in the bay between two of them, so no truss is cut. A wider window outline, drawn dashed, crosses a truss and would need designed trimming. Section600mm centresSeen square-on12345678

Sizing a roof window to the truss bays

  1. Fink trussed rafter, factory made and designed to work as one whole frame
  2. W-shaped webs, joined at every node by pressed metal nail plates
  3. Tile covering on battens over the underlay
  4. Roof window set in the slope, fitted between trusses so the frame is untouched
  5. Narrow roof window sitting in the bay between two trusses
  6. Trusses at even 600mm centres along the roof
  7. No truss cut: the trusses either side of the window stay whole
  8. A wider window crosses a truss, so the cut needs designed trimming from an engineer or the truss maker

When a rafter is cut and why the neighbours get doubled

If you pick a window wider than the bay, one rafter (sometimes more) has to be shortened. The cut rafter now stops at the top and bottom of the opening instead of running from wall plate to ridge. Horizontal trimmers are fixed across the head and the sill to catch its ends, and those trimmers hand the load sideways to the rafters on each side. Those side rafters are now carrying their own share plus part of the one that was cut, so they are doubled: a second timber of matching depth is fixed alongside, bolted or nailed to a set pattern, and runs the full length of the slope.

The rule: cut one rafter, double the two beside it and trim top and bottom. The exception: where the timbers are unusually deep, the span is short or an engineer has calculated something different, the specification may change, so the survey and any design decide the detail rather than a rule of thumb.

Cut rafters and trussed rafters need different answers

The doubling described above belongs to the traditional cut rafter roof, built on site from loose timbers, which is what you find in the older cottages of Old Basing, Overton or Kingsclere. On those roofs rafter spacing is not fixed, so the survey measures it bay by bay before any window width is chosen.

A trussed roof, the kind on the Popley, Brighton Hill or Chineham estates, is a set of factory-made frames joined with metal plates and braced to act together. There, the equivalent step is a doubled or tripled truss either side of the gap, but it is never improvised from the cut rafter pattern. The truss designer or a structural engineer specifies it for that roof.

Doubling up for a VELUX: what changes by roof type
SituationCut rafter roofTrussed rafter roof
Window fits inside one bayNo doubling; trimmers at head and sill if neededNo doubling; every truss stays whole
One timber must be shortenedRafters either side doubled, trimmers top and bottomDesigned trimming, often doubled trusses, to a written specification
Two windows side by sideOne rafter left between them, or a trimmed openingA whole truss left between them where the spacing allows
Who decides the detailThe survey, with an engineer where the roof is unusualThe truss designer or a structural engineer

How to avoid doubling altogether

If the room needs more light than one narrow window gives, two windows in neighbouring bays usually beat one wide window that forces a cut. Each sits between its own pair of timbers, the rafter or truss between them stays whole, and the pair can be matched for a tidy look inside. Our answer on fitting VELUX windows in a row covers how the flashing combines, and choosing the right VELUX size walks through matching window height to the room.

A tall narrow roof window can also give as much glass as a squat wide one. In a loft room, height brings the view down to eye level, so it is often the better choice for the room as well as for the roof.

What the doubling job involves

Where a cut really is the right call, the order of work keeps the roof supported throughout.

  1. Measure. Timber depth, spacing, pitch and anything bearing on the roof near the opening are recorded at survey.
  2. Specify. The timber sizes, fixings and, on a trussed roof, the written trimming design are settled before a saw comes out.
  3. Notify. Changing roof structure is notifiable, and the Building Control notification is part of the job we carry out on your behalf.
  4. Double first. The new timbers go in alongside the neighbours and the trimmers are fixed before the rafter is cut, so the load always has a path.
  5. Fit. The VELUX frame, flashing and lining go in, then the inside is made good.

That structural work falls under the 10-year workmanship guarantee along with the window, which is a guarantee from us and is not insurance backed.

New homes and loft conversions

On a newer house still inside a housebuilder warranty, read the warranty terms before any roof timber is altered; a window that fits between the trusses sidesteps the issue entirely. See can a VELUX go into a new build roof? for that situation. In a loft that has already been converted, the conversion may have added steel or new rafters, so what is behind the plasterboard is checked before a skylight or rooflight width is agreed.

If you want to know whether your idea needs doubled timbers at all, ask us to measure the roof and we will show you the answer on your own rafters.

Free roof survey

Tell us about your roof

  • Survey before any quote
  • No obligation
  • Plain-English advice

Say what you have in mind and where. We survey the roof before we quote, then tell you plainly what fits.

Prefer to talk? 01256 213206

Request my survey