Part P is the part of the Building Regulations in England that deals with electrical safety in homes, and it only ever looks at the wiring. Whether your motorised skylight triggers it comes down to three things: where its power comes from, which room it serves, and who does the connection. Our electric and opening rooflight installation page covers the whole job from survey to handover; this page stays on the Part P question alone.
Two separate notifications, not one
An electric rooflight can touch two different parts of the Regulations at once, and they run on separate tracks. The roof opening, the frame and its thermal performance fall under the building work side: structure where timbers are trimmed, and energy efficiency for the new glazed unit in the roof. The supply that powers the motor falls under Part P. A Basingstoke homeowner can end up with one, both or neither being notifiable, depending on the roof and the wiring.
The rule: treat the roof and the wiring as two questions with two answers. The exception is timing: both are settled at the survey stage so the paperwork for each is lined up before the roof is opened, rather than discovered afterwards.
For the roof side, Everlight takes care of telling Building Control where the opening is notifiable. The electrical side is certified by whoever carries out the electrical connection, which is why it helps to know early which route applies.
How rooflights and roof windows open
- Centre-pivot sash, turns so the lower edge tips out and the top swings in, handy for cleaning from inside
- Pivot point, the hinge line across the middle of the sash
- Top-hung sash, swings outward clear of the opening for a wider view
- Top hinge, where the sash is hung from the head of the frame
- Fixed rooflight, glazing sealed to the upstand with no moving parts
- Electric opening rooflight, the glazed lid lifts from one edge for ventilation
- Motorised chain actuator, pushes the lid open and draws it closed
- Rain sensor, closes the rooflight automatically when it starts to rain
What decides it: the power source and the room
These are the common set-ups for an opening rooflight in a home, and how Part P treats each one in England.
| Supply route | Notifiable under Part P? | Who certifies it |
|---|---|---|
| Solar unit with its own panel and battery | No, there is no connection to the house wiring | Nothing to certify on the electrical side |
| Fused spur from an existing circuit, ordinary room | Usually not | The electrician, with a minor works certificate as good practice |
| New dedicated circuit from the consumer unit | Yes | A registered electrician self-certifies, or Building Control is notified first |
| Any new supply in a bathroom or shower room | Yes, where it falls in the zones around the bath or shower | A registered electrician, or Building Control |
| Consumer unit replaced to make room for the circuit | Yes | A registered electrician, or Building Control |
Non-notifiable does not mean unregulated. Every piece of domestic electrical work still has to meet the wiring regulations and be done safely; the difference is only whether anyone has to be told. Why the solar route sidesteps all of this, and what it gives up in return, is weighed in our guide comparing solar-powered and mains rooflights.
Where the low voltage side fits in
Most mains opening rooflights take their feed into a control unit, and the control unit sends low voltage on to the motor in the frame, the rain sensor and the keypad. That makes people wonder whether the thin cable up to the frame counts as notifiable wiring. In practice, the Part P question is settled at the mains end: the spur or circuit feeding the control unit. The low voltage run is part of the manufacturer's system and goes in to their instructions, with the cable hidden in the reveal as the linings are formed.
Where that control unit sits, how the cable reaches it, and why the position matters for later access, are covered in our guide to wiring, power and controls for an electric rooflight.
The bathroom and en suite case
A pitched ceiling over a bath is one of the places an opening skylight earns its keep, because it lets steam out at the highest point of the room. It is also the one room where the electrical answer changes. Rooms with a bath or shower are special locations under the wiring regulations, and new electrical work there, within the zones around the bath or shower, is notifiable under Part P whatever the size of the job.
A rooflight directly over a bath in a loft en suite can fall inside those zones, so the supply route, the control unit position and the switching need to be planned with that in mind. Our answer on whether an opening rooflight suits a bathroom looks at the room itself; the Part P point is simply that this is notifiable work and should be treated that way from the start.
How a registered electrician changes the paperwork
Notifiable does not have to mean a separate application. An electrician registered with a competent person scheme can do the work and self-certify it, and the scheme then tells the local authority on your behalf. You receive an electrical installation certificate and, later, a compliance certificate. Where the work is done by someone outside a scheme, a building notice or full plans application goes to Building Control before work starts, and Building Control arranges its own inspection.
- Confirm the route. At the survey we look at where power could come from: a nearby circuit in the loft void, a landing light circuit, or the consumer unit itself.
- Decide the category. Spur in an ordinary room, new circuit, or a bathroom supply. That decides whether the job is notifiable.
- First fix. The feed to the control unit is run while the reveals and ceiling are still open, alongside the roof work.
- Connect, test and certify. The supply is connected and tested, the motor and sensor are run through, and the certificate for the electrical work is handed over with the rest of the job paperwork.
Keep the certificates with the house deeds. A buyer's solicitor may ask for evidence that notifiable electrical work was certified, and the compliance certificate is that evidence.
Infographic
Planning and Building Control: the questions in order
Is the house listed?
Yes: listed building consent is needed before any rooflight goes in.
No: next question.
Is it in a conservation area, or a flat or maisonette?
Yes: check with the council. A conservation-style rooflight is often the expected choice.
No: next question.
Will it sit within permitted development limits?
Usually yes when it projects no more than 150mm from the roof plane and stays below the highest part of the roof.
If not: a householder planning application.
Is the work notifiable under the Building Regulations?
A new rooflight, or a replacement that changes the structure, is. We notify Building Control for you.
Either way the glazing must meet current thermal standards.
What this means on a Basingstoke estate roof
On the trussed estates around the town, from Brighton Hill to Chineham, a loft void above the ceiling usually gives an easy run for a cable, and a lighting or socket circuit is often close by. That favours a spur, which usually keeps the electrical side outside notification. Loft conversions are different: the room below is finished, the void may be gone, and a new circuit is sometimes the tidier answer, which brings Part P in. A fixed unit being changed for an opening one in a room already plastered is the case where a solar model can take Part P out of the picture entirely; does an electric rooflight need an electrician? sets out who is involved in each case.
The simplest way to know which applies to your house is to look at it. Tell us the room and where you want the rooflight, and arrange a survey so the roof opening and the power route are decided together, with the workmanship guaranteed for 10 years (a guarantee from us, not insurance backed).