GuideEnergy efficient rooflights

Part L and what it asks of a new rooflight

What Part L of the Building Regulations checks when a rooflight is added or replaced, from the U-value to the fitting detail and the glazed area.

Frost on a tiled roof around a roof window
Frost on a tiled roof around a roof window

Part L is the section of the Building Regulations in England that deals with the conservation of fuel and power. When a new rooflight goes into an existing house, it is the part that asks the most specific questions about the glass and frame you choose, and it is the part homeowners tend to hear about last, usually from a quote that mentions "compliant glazing" without saying what that means. This guide walks through what Part L actually looks at when a skylight is added or changed, which bits are your installer's job, and which decisions are still yours to make.

It is written for houses around Basingstoke, where the typical question is a roof window in a trussed estate loft, a flat rooflight over a kitchen extension, or a tired old dome being swapped out. Part L treats each of those a little differently, and the differences are worth knowing before you compare quotes.

What Part L is, in one paragraph

The Building Regulations set out legal requirements; the Approved Documents are the government's published guidance on how to meet them. Approved Document L, Volume 1, covers dwellings. It does not tell you which brand to buy. It sets performance limits for the parts of a house that lose heat (walls, roofs, floors, windows, doors and rooflights) and expects any new or replacement element to meet them. For a rooflight, that means a heat-loss figure the unit must not exceed, a sensible fitting detail so heat does not escape round the edges, and, on extensions, a check that the total amount of glazing is reasonable for the floor area it serves.

Part L sits alongside other parts that also touch a rooflight: Part F on ventilation, Part A on structure (the trusses and rafters), and Part B on fire where an opening is near a boundary or on an escape route. This page stays with Part L and points elsewhere when the question belongs to another part.

How a sealed rooflight unit works and fails Two close-up edge sections of a double-glazed rooflight unit. On the left a healthy unit: two panes held apart by a warm-edge spacer bar filled with desiccant, primary and secondary seals, a dry sealed cavity and a low-emissivity coating on one inner face. On the right the edge seal has broken, moist air has got in and mist sits between the panes; a small inset shows condensation on the room-side face of the glass instead, which is a ventilation issue, not a failed unit. Healthy unit Failed seal 1234 5678

How a sealed rooflight unit works and fails

  1. Outer and inner glass panes, with the outer pane facing the weather
  2. Low-emissivity coating on one inner face, reflecting heat back into the room
  3. Warm-edge spacer bar holding the panes apart, filled with desiccant to soak up trace moisture
  4. Primary seal against each pane, backed by the secondary seal around the edge
  5. Dry sealed cavity, the insulating layer between the panes
  6. Broken edge seal: moist air gets in and the desiccant becomes saturated
  7. Mist and droplets trapped between the panes; they cannot be wiped off and the sealed unit needs replacing
  8. Inset: condensation on the room-side face of the glass is a ventilation or humidity issue, not a failed unit

The word that matters: controlled fitting

In the Regulations, a window, rooflight or roof window is a "controlled fitting". Putting one in, or replacing one, is building work, which is why it has to be notified. That is the practical reason Part L applies even when you are only swapping like for like: the new unit is a new controlled fitting, so it has to meet today's standard, not the standard the house was built to.

There are two routes to showing that. A fitter registered with a competent person scheme can self-certify the work. Otherwise the work is notified to Building Control, either the local authority team (Basingstoke and Deane, Hart, West Berkshire and the rest) or a registered building control approver, who checks it and issues a completion certificate. Everlight takes the second route and sends that notification as part of the job, so the certificate arrives with the house records rather than as a job left for you.

If you want the short yes-or-no on whether a straight swap counts, our answer on whether a replacement rooflight has to meet Part L gives it in a couple of sentences. The rest of this guide is the detail behind that answer.

What Part L checks on a new rooflight

Strip away the language and a building control officer looking at a rooflight wants to see four things. Each one is a separate question, and a unit can pass one and fail another.

The four things Part L looks at when a rooflight is fitted
What is checkedWhat it means in practiceWho decides it
Whole-unit U-valueThe declared heat loss of the complete rooflight (glass and frame together) must be at or below the limiting figure for a new fittingThe product choice, confirmed on the manufacturer's declaration
Fitting detailInsulation is continuous up to the frame, so there is no cold strip round the opening where heat escapes and condensation formsThe installer, on the day
Air leakageThe gap between frame and roof is sealed and the vapour control layer inside is joined to the frame, not left looseThe installer, with the right collar and membrane kit
Glazed area (extensions)On a new extension, the total of windows, doors and rooflights is kept within the guidance limit, or a calculation shows the extension still performsThe design, agreed before the order is placed

A product brochure only answers the first row. The other three depend on how the skylight is set into your particular roof, which is why a Part L conversation is as much about the installation as the unit.

The U-value figure and how to read it

The U-value is the rate at which heat passes through the rooflight; lower is better. Part L sets a maximum for a new fitting, and the figure you compare against it is the whole-unit value, not the centre-pane value of the glass alone. The centre of a sealed unit always looks better on paper than the unit as a whole, because the frame and the glass edge lose more heat than the middle of the pane. For the plain-terms explanation of what the number means, see our guide to rooflight U-values explained; for the current limiting figure itself, the answer on what U-value a new rooflight should have keeps it in one place.

Two details on a declaration catch people out. First, the orientation it was measured in: a rooflight lying close to flat loses more heat than the same unit standing upright, so a figure measured vertical flatters a flat-roof product. Ask which plane the value refers to. Second, the size it was measured at: declared values are usually for a standard test size, and a very small or very large unit can differ. Neither is a trick, but both matter when a unit sits close to the limit.

Part L is judged on the whole rooflight as it sits in your roof, not on the best number in the brochure.

The edge of the opening is where Part L is won or lost

A rooflight with a good U-value can still be a poor installation if the opening round it is left cold. Part L asks for the insulation of the roof to run continuously to the frame and for thermal bridging to be limited. In a pitched roof that means insulation packed into the lining round the roof window and an insulating collar where the frame meets the rafters or trusses. On a flat roof it means an upstand or kerb that is itself insulated, so the rooflight is not perched on a cold timber box.

The detail varies by roof, and each version has its own page. The loft-room case, where plasterboard linings meet sloping ceilings and dormer cheeks, is covered in insulating around a roof window in a loft room. The flat-roof case, where the kerb is the weak point, is in thermally broken frames and cold bridging at the upstand, and the direct answer on whether an insulated upstand is needed sits alongside it.

The rule: insulation and airtightness are carried right up to the frame, whatever the roof. The exception: in a trussed rafter roof, nothing is cut away from the truss to make room for extra insulation; the lining is built out on the room side instead, so the structure stays as designed.

Replacing an old rooflight: what changes and what does not

Swapping an existing unit is the most common Part L situation on the estates round Basingstoke: a crazed plastic dome on a 1970s flat roof, or a single-glazed or early double-glazed timber roof window in a Brighton Hill or Oakridge loft. The new unit has to meet the current limit, even though the one coming out was fitted to an older standard. In practice that is rarely a hardship, because modern double-glazed units are built to meet it.

What a replacement does not usually trigger is a wholesale upgrade of the roof around it. Part L expects the new fitting to perform and the work around it to be done properly; it does not expect you to re-insulate the whole loft because one skylight changed. Where the old lining round the frame has no insulation in it at all, though, putting some back as the new unit goes in is part of making good, and it is the moment to do it cheaply. For owners working out how much the old unit was costing them, heat loss through old rooflights in 1970s and 1980s homes looks at that question on its own.

Loft room with a new roof window set into an insulated sloping ceiling
A replacement roof window with insulation carried up to the frame in an estate-house loft room

Infographic

Planning and Building Control: the questions in order

  1. Is the house listed?

    Yes: listed building consent is needed before any rooflight goes in.

    No: next question.

  2. Is it in a conservation area, or a flat or maisonette?

    Yes: check with the council. A conservation-style rooflight is often the expected choice.

    No: next question.

  3. Will it sit within permitted development limits?

    Usually yes when it projects no more than 150mm from the roof plane and stays below the highest part of the roof.

    If not: a householder planning application.

  4. Is the work notifiable under the Building Regulations?

    A new rooflight, or a replacement that changes the structure, is. We notify Building Control for you.

    Either way the glazing must meet current thermal standards.

A general guide to the order of questions, not advice on a particular house. We check your position at the survey.

New openings and extensions: the glazed area question

Cutting a new opening for a skylight in an existing roof is still a controlled fitting under Part L, and the same U-value and fitting rules apply. The extra question arrives when the rooflight is part of an extension. Approved Document L sets a guideline for how much of an extension can be glazed, measured against its floor area, with an allowance for windows and doors removed from the original wall.

A kitchen extension with a large lantern, bi-fold doors and a flat rooflight can reach that guideline quickly. If it does, there are two ways forward. One is to trim the glazing back. The other is to show by calculation that the extension as a whole performs no worse than one built to the guideline, usually by using better-performing glazing or more insulation elsewhere. That calculation is normally part of the extension's own building control application, prepared by the designer, so the rooflight choice needs to be settled before it is run, not after.

This is also where energy sits against daylight. Our guide to balancing daylight gain against heat loss covers how to size a rooflight so the room is bright without carrying more glass than it needs.

How the Part L side of a job runs

From first visit to certificate, the Part L work is folded into the ordinary sequence of a rooflight job. It looks like this.

  1. Survey. We look at the roof type, the pitch or deck, the existing insulation and, in a trussed roof, the spacing, so the unit and its fitting detail are chosen together.
  2. Specification. The quote names the unit and its declared whole-unit U-value, the flashing or kerb, and the insulating collar or upstand that goes with it.
  3. Notification. Building Control is notified before or as the work starts, depending on the route the authority uses.
  4. Installation. The unit is fitted with insulation and the vapour control layer taken to the frame, and the lining inside is made good.
  5. Completion. The certificate follows once Building Control is satisfied, and it belongs with the house deeds for when you sell.

Our workmanship on the installation is guaranteed for ten years; the guarantee is our own and is not insurance backed.

Ventilation, condensation and why Part L and Part F travel together

Making a room more airtight and better insulated changes how moisture behaves in it. The Approved Documents recognise this: work that improves airtightness should not leave a room short of ventilation. For a rooflight, that usually means a trickle vent in the frame, or an opening sash, where the room relies on it. The details, and when a vent is expected, are in our answer on whether a new rooflight needs a trickle vent.

The link to Part L is condensation. A warm frame and an insulated opening keep the inside surfaces above the dew point, which is the main reason a new, compliant skylight streams less than the one it replaces. Ventilation deals with the moisture that is left. Get both right and the room is warmer and drier at once.

Older and protected houses

Part L makes allowance for historic buildings, listed buildings and homes in conservation areas. The aim there is to improve energy performance as far as is reasonable without harming the character of the building or causing moisture problems in traditional construction. For a cut rafter roof in Old Basing, Odiham or Overton, that usually points to a conservation rooflight: slim, flush, with a modern sealed unit behind a traditional-looking frame. The balance between appearance and U-value is part of the planning conversation, and our conservation rooflight installation page explains how that is approached. The planning authority decides consent on each application; nothing about Part L settles it in advance.

A sunny room under solar control glass
Figure 3 A sunny room under solar control glass

Questions to put to any quote

You do not need to read the Approved Document to check a quote. Ask what the declared whole-unit U-value is and which plane it was measured in; how the insulation will be carried to the frame on your roof; whether the work will be notified, and by whom; and, on an extension, whether the glazed area has been checked. A good answer to all four is the Part L side of the job in plain terms. The wider picture, including glazing, coatings and frames, is on our energy efficient rooflights service page, and for the whole range of fitting work there is skylight installation across the Basingstoke area.

When you are ready to see what your own roof needs, arrange a survey and we will measure it, name the unit and show you how it meets Part L before any work is agreed. The parent hub on choosing an energy efficient rooflight is the next place to read if you are still weighing options.

Free roof survey

Tell us about your roof

  • Survey before any quote
  • No obligation
  • Plain-English advice

Say what you have in mind and where. We survey the roof before we quote, then tell you plainly what fits.

Prefer to talk? 01256 213206

Request my survey